Numerical control lathe maintenance at ordinary times
1, every day completes various rail surface clean and smooth, have the initiative of the system of smooth machine to check punctuality, clean smooth system actively, check the oil amount, timely increase smooth oil, check the oil pump is punctual start preview and suspension.
2, check the spindle box every active smooth system operation is normal, punctual smooth oil to replace the spindle box.
3, pay attention to check the electrical cabinet cooling fan is operating normally, air duct filters have without block, clean from the dust.
4, pay attention to check the cooling system, check the liquid level height, increase oil or water, in time to change the clean oil, water is dirty.
5, pay attention to check the spindle drive belt, adjust the tightness.
Article 6, pay attention to view the guide with the tightness, regulate gap.
7, pay attention to check the machine tool hydraulic system pump tank with or without abnormal noise, homework oil level height is appropriate, pressure gauge indication is normal, piping and the joint presence of leaks.
8, pay attention to view the guide rail, machine tool protective cover is useful completely.
9, pay attention to check all the moving parts of mechanical precision, cutting shape and position error.
10, after work every day completes the machine cleaning, cleaning the iron filings, static rail parts of the coolant, avoid guide rust.
Punch in peacetime maintenance
1. According to the request, smooth to the oil hole and sliding some smooth oil injection.
2. Strictly abide by the punch of safe operation request.
3. Make the device should be idle 3 min, a former survey presence of anomalies.
4. When installing a mold, block the power.
5. Job end should wipe job mesa, wipe out the leftover material and sundry, block the power.
6. Finishing homework.
06-22
Stainless steel welded joint should be how to deal with?
Stainless steel welded joint should be how to deal with?The polishing of stainless steel weld joint for flat parts must be polished after welding, grinding should be butt head flattening before (she
06-22
Laser welding of stainless steel pipe welding method
【 welding knowledge 】 the laser welding of stainless steel pipe welding methodLaser weldingIn all of the steel pipe welding application, the edge of the steel strip to melt, when use the clamp bracke
06-22
Nc machine tools how to maintenance
數(shù)控車床平時養(yǎng)護 1、天天做好各導軌面的清潔光滑,有主動光滑體系的機床要守時查看、清潔主動光滑體系,查看油量,及時增加光滑油,查看油泵是不是守時發(fā)動打油及中止?! ?、天天查看主軸箱主動光滑體系作業(yè)是不是正常,守時更換主軸箱光滑油。 3、留意查看電器柜中冷卻電扇是不是作業(yè)正常,風道過濾網(wǎng)有無阻塞,清潔沾附的塵土?! ?、留意查看冷卻體系,查看液面高度,及時增加油或水,油、水臟時要更換清潔
06-22
Nc machining experience
Because of the complexity of the numerical control processing, such as different machine, different materials, different cutting tool, different cutting way, different parameter Settings, etc.), the